The Erkkilän silta overbridge was renewed in 2025–2026. The old bridge was taken down and replaced with a new wider bridge that is suited for more versatile use. The refurbished Erkkilänkatu street now has separate bicycle lanes and pedestrian pavements in addition to the car lanes.
1983
CURRENT BRIDGE COMPLETED
15.6.2026
NEW BRIDGE WAS OPENED TO ALL TRAFFIC TWO MONTHS IN ADVANCE
Watch the old bridge get lifted about 1,5 meters to build the steel racks (in Finnish).
Skip video embed